Crane provides the power industry with material handling equipment suitable for use in individual power plants. Whether it is a traditional thermal power plant, a large hydroelectric power plant, or a remote wind farm, we can provide the right cranes and services to meet your every need, such as power station cranes, hydropower bridge cranes.
The work classification is heavy .The group classification of the crane is A6.The direction of platform door to the driver’s cap is: side, end and top. The lifting capacity includes the weight of the grad.
It is only suitable for bulk materials in natural stacking conditions. If grabbing the materials under the water or special materials, they must be specialized when ordering.
Electric double disc grab bucket refers to the tool used by a crane to grab dry and loose goods. Two or more bucket shaped jaw plates that can be opened and closed together form a storage space. When loading, the jaw plate is closed in the material pile, and the material is grabbed into the storage space. When unloading, the jaw plate opens in a suspended state on the material pile, and the material is scattered on the pile. The opening and closing of the jaw plate is generally controlled by the steel wire rope of the lifting mechanism of the crane.
MG Double Girder Gantry Crane mainly consists of a gantry, a lifting trolley, a crane operating mechanism, a driver's cab, and an electrical control system.
The operation mode adopts a closed driver's cab, which has adjustable seats, an insulation mat laid on the bottom plate, and tempered glass used for the window glass. According to user requirements, items such as cold and warm air conditioning, sounders, walkie talkies, etc. can be configured.
KE Crane Hook can be divided into single hook and double hook according to shape. The advantage of single lifting hook is that its processing technology is relatively simple, and its structure is also relatively simple, making it easy to use. However, the disadvantage is that due to the structure, the stress situation is not complete enough, and the bearing capacity is low. Generally, it can only be used in work situations with a lifting weight of 80 tons or less. When the lifting weight is large, a double hook with symmetrical stress needs to be used.
The annual output is more than 900,00 units, with more than 100 sets of advanced equipment, and the full product line automation rate reaches 80% .
Control project delivery, cost and quality ,from design to end of building ,according to customer's technical requirements
Provide comprehensive training, including equipment structure and principle training, installation specification training, etc., also 24H after-sales technical supporting, to ensure equipment stable operation on site
We provide over 220 types of cranes and their related products, saving customers’ purchasing time.